Slurry handling / Information

Slurry handling guides

Choose the slurry handling purchase question that matches your current review, then prepare the information requested in the corresponding guide.

Slurry handling guides: scope and configuration

Compare horizontal and vertical slurry pump proposals against the intended installation and the same duty records. Horizontal vs vertical slurry pump

Prepare a split case pump requirement around the intended transfer duty, fluid records and installation limits. Split case pump requirements checklist

A particle size enquiry should identify the sampled slurry and the report behind its particle description. Slurry pump solids particle size

Temperature condition enquiries should identify the operating case and the record behind the stated temperature requirement. Slurry pump temperature conditions

Material compatibility enquiries should connect a proposed component with a defined slurry and operating condition. Slurry pump material compatibility

Slurry handling guides: project documents

Prepare submersible and sump pump comparison questions around the installation each proposal actually describes. Submersible vs sump slurry pump

A skid mounted slurry pump enquiry should identify the equipment boundary and the interfaces expected on the proposed package. Skid mounted slurry pump requirements

Slurry concentration enquiries need the definition behind the reported value as well as the value itself. Slurry pump concentration requirements

Seal selection questions should identify the proposed pump assembly and the process conditions the buyer wants reviewed. Slurry pump seal selection questions

Impeller and liner inspection enquiries should identify the exact assembly and the observations recorded for its components. Slurry pump impeller and liner inspection

Slurry handling guides: technical questions

Compare self priming and flooded suction enquiries by describing the source arrangement and the proposed pump location. Self priming vs flooded suction slurry pump

Define the slurry pump duty with flow and head submitted together for each operating case. Slurry pump flow and head duty point

Prepare abrasion assessment questions with the slurry sample records and the observations available from the intended duty. Slurry pump abrasion assessment

Compare electric and diesel drive enquiries using the same pump duty and the actual site requirements. Slurry pump electric vs diesel drive

Bearing maintenance document requests should begin with the pump and bearing assembly identification. Slurry pump bearing maintenance documents

Slurry handling guides: purchase preparation

A multistage pump enquiry should begin with the project duty and the documents needed to review a proposed arrangement. Multistage pump selection questions

Slurry pump discharge size enquiries should start with the existing or planned piping interface. Slurry pump discharge size requirements

Corrosion assessment enquiries should identify the fluid record, operating conditions and components being questioned. Slurry pump corrosion assessment

Request a slurry pump performance curve together with the configuration it describes and the duty it is intended to address. Slurry pump performance curve request

Spare parts enquiries should connect the requested item with the pump assembly, old component and drawing records available to the buyer. Slurry pump spare parts identification